New Business Fees
Fair Oaks Water District |
||||
Activity |
2006 |
|||
|
|
|
|
|
Connection (system utilization) fees: |
|
|||
|
1" service |
$ 2,475 |
||
|
1 ½" service |
$ 4,235 |
||
|
2" service |
$ 6,413 |
||
|
4" service |
$ 18,755 |
||
|
6" service |
$ 36,905 |
||
|
8" service |
$ 49,005 |
||
|
|
|
|
|
Tapping and service installation fees, District installed (1): |
|
|||
|
1" service |
$ 2,420 |
||
|
1 ½" service |
$ 3,146 |
||
|
2" service |
$ 3,630 |
||
|
|
|
|
|
Peak Hour Pressure and Flow Mitigation Fee |
|
|||
|
Based upon peak hour system demand increases |
|
||
|
calculated for all new development. |
|
||
|
|
Per gallon per minute of impact |
$ 46 |
|
|
|
|
|
|
Hydrant Flow Testing (minimum) |
|
|||
|
Minimum test fee |
$ 152 |
||
|
Trouble shooting: per hour rate ( 2 persons minimum) |
$ 113 |
||
|
|
|
|
|
Fire Flow (minimum) |
|
|||
|
|
Fire flow letter - Standard service |
$ 76 |
|
|
|
Fire flow letter - Same day service |
$ 152 |
|
|
|
Fire flow verification - Standard |
$ 103 |
|
|
|
Fire flow verification - Additional |
$ 206 |
|
|
|
|
|
|
Backflow Testing |
|
|||
|
Normal Turnaround ( one week service) |
$ 77 |
||
|
Same day service |
$ 149 |
||
|
Retesting |
$ 77 |
||
|
Service and repairs to backflow (per hour) |
$ 83 |
||
|
New installation and retrofits2 |
T & M |
||
|
|
|
|
|
|
|
|
|
|
Inspection And Supervision Fees (2) : |
|
|||
|
|
|
|
|
Inspection Fee (minimum) |
|
|||
|
|
Inspection per hour - standard |
$ 79 |
|
|
|
Inspection - additional/non-standard |
$ 121 |
|
|
|
|
|
|
Private Development Fees (Minimum): |
|
|||
|
Calculated at 5% of the estimated Public Water |
|
||
|
|
system value |
|
|
|
OR |
|
||
|
Pipeline inspections (each) |
$ 455 |
||
|
Notifications and shutdowns (each) |
$ 242 |
||
|
Tie-ins (each) |
$ 304 |
||
|
Hydrostatic testing (each) |
$ 304 |
||
|
Plan checking (minimum) |
$ 242 |
||
|
Plan checking-additional (per hour) |
$ 109 |
||
|
County trench cut fee(per square foot) |
$ 15 |
||
|
|
|
|
|
Construction Fees: |
|
|||
|
Based upon labor, equipment and materials for each project: |
|||
|
|
|
|
|
Water Usage Fees: |
|
|||
|
Basic residential service, annually |
$ 520 |
||
|
Special service, per 100 cubic feet |
$ 1.40 |
||
|
Construction water |
|
||
|
|
Schedule A (per lot or parcel) |
$ 52 |
|
|
|
Schedule B (trench excavation, per CY) |
$ 10 |
|
|
|
Schedule C (grading, per 100 CY) |
$ 10 |
|
|
|
Schedule D (acreage, per acre) |
$ 219 |
|
|
|
Schedule E (metered usage, per 1000 gal.) |
$ 9 |
|
|
|
Special Event - non-metered: daily(3) |
$ 50 |
|
|
Annual fire line maintenance fee |
$ 26 |
||
|
Coliform samples (each) |
$ 73 |
||
|
|
|
|
|
|
|
|
|
|
Notes: |
|
|
|
|
(1) |
Fees listed are based on estimated average costs for services |
|||
|
provided on typical projects, and are listed here for reference only. |
|||
|
Actual charges will be based on the District's total incurred project |
|||
|
cost, and may vary substantially from the price quoted herein. For new |
|||
|
construction, the appropriate connection fee will be charged in addition |
|||
|
to installation fees. |
|
||
(2) |
Fees listed are based on estimated average costs for services |
|||
|
provided on typical projects, and are listed here for reference only. |
|||
|
Actual charges will be based on the District's total incurred cost, at |
|||
|
the rate of $60 - $95 per hour, plus expenses, and may vary |
|||
|
substantially from the price quoted. |
|
||
(3) |
Minimum service fee for any special event not previously defined. |
|||