Rates and Fees

New Business Fees

Fair Oaks Water District
2007

Activity

2006

 

 

 

 

 

Connection (system utilization) fees:  

 

 

1" service

 $         2,475

 

1 ½" service

 $         4,235

 

2" service

 $         6,413

 

4" service

 $       18,755

 

6" service

 $       36,905

 

8" service

 $       49,005

 

 

 

 

 

Tapping and service installation fees, District installed (1):

 

 

1" service

 $         2,420

 

1 ½" service

 $         3,146

 

2" service  

 $         3,630

 

 

 

 

 

Peak Hour Pressure and Flow Mitigation Fee

 

 

Based upon peak hour system demand increases

 

 

calculated for all new development.

 

 

 

Per gallon per minute of impact

 

 $               46

 

 

 

 

 

Hydrant Flow Testing (minimum)

 

 

Minimum test fee

 $             152

 

Trouble shooting: per hour rate ( 2 persons minimum)

 $             113

 

 

 

 

 

Fire Flow (minimum)

 

 

 

Fire flow letter - Standard service

 $               76

 

 

Fire flow letter - Same day service

 $             152

 

 

Fire flow verification - Standard

 $             103

 

 

Fire flow verification - Additional

 $             206

 

 

 

 

 

Backflow Testing

 

 

Normal Turnaround ( one week service)

 $               77

 

Same day service

 $             149

 

Retesting

 $               77

 

Service and repairs to backflow (per hour)

 $               83

 

New installation and retrofits2

T & M

 

 

 

 

 

 

 

 

 

 

Inspection And Supervision Fees (2) :

 

 

 

 

 

 

Inspection Fee (minimum)

 

 

 

Inspection per hour - standard

 $               79

 

 

Inspection - additional/non-standard

 $             121

 

 

 

 

 

Private Development Fees (Minimum):

 

 

Calculated at 5% of the estimated Public Water

 

 

 

system value 

 

 

OR

 

 

Pipeline inspections (each)

 $             455

 

Notifications and shutdowns (each)

 $             242

 

Tie-ins (each)

 $             304

 

Hydrostatic testing (each)

 $             304

 

Plan checking (minimum)

 $             242

 

Plan checking-additional (per hour)

 $             109

 

County trench cut fee(per square foot)

 $               15

 

 

 

 

 

Construction Fees:

 

 

Based upon labor, equipment and materials for each project:

 

 

 

 

 

Water Usage Fees:  

 

    

Basic residential service, annually

 $             520

 

Special service, per 100 cubic feet

 $            1.40

 

Construction water

 

 

 

Schedule A (per lot or parcel)

 $               52

 

 

Schedule B (trench excavation, per CY)

 $               10

 

 

Schedule C (grading, per 100 CY)

 $               10

 

 

Schedule D (acreage, per acre)

 $             219

 

 

Schedule E (metered usage, per 1000 gal.)

 $                 9

 

 

Special Event - non-metered: daily(3)

 

 $               50

 

Annual fire line maintenance fee

 

 $               26

 

Coliform samples (each)

 

 $               73

 

 

 

 

 

 

 

 

 

 

Notes:

 

 

 

 

(1)

Fees listed are based on estimated average costs for services

 

provided on typical projects, and are listed here for reference only.

 

Actual charges will be based on the District's total incurred project

 

cost, and may vary substantially from the price quoted herein. For new

 

construction, the appropriate connection fee will be charged in addition

 

to installation fees.

 

(2)

Fees listed are based on estimated average costs for services

 

provided on typical projects, and are listed here for reference only.

 

Actual charges will be based on the District's total incurred cost, at

 

the rate of $60 - $95 per hour, plus expenses, and may vary

 

substantially from the price quoted.

 

(3)

Minimum service fee for any special event not previously defined.

 