Schedule of Billing Fees and Charges

Fair Oaks Water District
2012

Activity

2011

2012

 

Other Billing Fees

 

 

Payment Processing Fee:  

 

 

 

Return check fee

 $          25

 $        25

 

 

 

 

Meter Service Fees: 

 

 

 

Meter re-read fee

 

 $        25

 

Meter test fee

 

 $       50

 

Reduce service size (1.5-inch to 1-inch)

 

 $      250
  Reduce service size (2-inch to 1-inch)    $      250

 

Reduce service size (2-inch to 1.5-inch)

 

 $      300

 

 

 

 

Late Penalty Fee: 

 

 

 

Late penalty fee - assessed after
the payment due date

 10%

 10%

 

 

 

 

Lien Processing Fee:  

 

 

 

Lien processing fee

 

 $        25

 

 

 

 

Disconnect Service Fees:  

 

 

 

Final notice service fee

 $         19

 $        19

 

Disconnect service fee

 $         61

 $        61

 

Deposit

 $       125

 $      125

 

 

 

 

Schedule of Fees and Charges

Fair Oaks Water District
2012

Activity

2011

2012

 

New Business Fees

 

 

Connection fees (1):  

 

 

 

1" service

 $         4,315

 $        4,643

 

1.5" service

 $         9,755

 $      10,447

 

2" service

 $       13,773

 $      18,572
  3" service  $       30,979  $      33,430

 

4" service

 $       48,195

 $      59,430

 

6" service

 $     103,145

 $    133,718

 

8" service

 $     166,765

 $    237,722

 

10" service

 

 $    371,440
     

Tapping and service installation fees:

 

 

 

1" service

 $         2,420

T&M

 

1.5" service

 $         3,146

T&M

 

2" service  

 $         3,630

T&M

 

 

 

 

Hydrant Flow Testing Fees:

 

 

 

Fire flow test

 $             152

$           200

 

Fire flow letter

 $              76

$             75

 

 

 

 

Backflow Device Testing Fee:

 

 

 

Test and tag

 $               77

$            125

 

 

 

 

Inspection Fee:

 

 

 

Inspection per hour (1 hour minimum)

 $               79

$            90

 

 

 

 

Development Fees:

 

 

 

Application for water service fee

 

$            50

 

Plan checking (minimum) 

$              242

$           300

 

Plan checking-additional (per hour)

$              109

$           100

 

 

 

 

Construction Fees:

 

 
  Construction Fee  
T&M

 

 

 

 

Water for Construction Purposes:  

 

 

    

Construction meter deposit
(with certified backflow device)

 

$       1,500

 

Construction meter daily charge

 

$           5.00

 

Cost of construction water (per CCF)

 

$          1.66

 

Bacteriological sampling (including lab cost)

 $               73

$         150

 

Additional testing (same location and time)

 

$           50

 

 

 

 

Notes:

 

 

 

(1)

Fees prior to 2012 included connection and pressure mitigation fees.

 

Rates and Fees
Fair Oaks Water District